Deira Waterfront Development Plot-02 (Phase-01)

Plot-02 of the Deira Waterfront Development, part of the DEP revitalization plan, involved constructing mixed-use infrastructure above the Dubai Metro Green Line tunnel. Encardio-Rite Geosystems LLC provided turnkey monitoring solutions, including the installation of geotechnical instruments like piezometers, strain gauges, inclinometer, and settlement points. Monitoring included tunnel responses to imposed loads, surface settlement, lateral movement, and water level changes. Automatic and manual data acquisition systems ensured real-time monitoring, with robotic total stations collecting data from prism targets. Weekly and monthly reporting with interpretation supported safe and efficient construction.

Deira Waterfront Development Plot-02 (Phase-01)

The Deira Waterfront project is part of the Deira Enrichment Project (DEP) - a plan to develop Deira and expand its footprint towards the sea. The DEP Masterplan seeks to retain Deira’s traditions and cultures and incorporate them into the revitalization of the waterfront area, a project known as Deira Waterfront. The Waterfront area is located in the northern portion of the Deira District across the street from the old souks along the creek. 

Plot 2 of Phase 1, comprises the construction of mixed-use development infrastructure, including four plazas, Osha, Afra, Maryam, and Hind. The Adagio aparthotel in Afra Plaza consists of 189 furnished apartments. The project was being constructed above the Green metro line tunnel. Thus, safety instrumentation and monitoring of the metro tunnel, as well as the shoring works, became critical during and after the construction activities.

The purpose of the monitoring instrumentation was to study metro tunnels' response to the loads and surcharges imposed during construction and to ensure that the responses were within design predictions. The monitoring data also provides early warning through regular or continuous monitoring for excessive and undue ground movements. 

The project was monitored for surface settlement above the tunnel centerline, the lateral movement towards the tunnel, change in water level, settlement of tracks inside the tunnel, change in load inside the tunnel, convergence inside the tunnel, and crown settlement. Further, parameters like settlements, wall lateral movements, strut/anchor loads, bottom heave, etc. were monitored, providing confidence in the construction process.

Encardio Rite Geosystems LLC in UAE was awarded an I&M sub-contract for the turnkey monitoring solutions that included: 

  • Supply, installation, and monitoring of geotechnical instruments inside the tunnel to monitor the response of the loads and surcharges imposed by the construction activities; for shoring works
  • establishment, measurements, and maintenance of the survey network
  • Setting up a convergence monitoring system inside the tunnel using robotic total stations & control boxes
  • Manual and automatic monitoring
  • Weekly & monthly reporting with evaluation & Interpretation

Geotechnical instruments used for monitoring and surveying during construction activity included piezometers, inclinometer, strain gages, standpipes, borehole extensometers, tunnel displacement gages, crack mater, track monitoring points, settlement points, and prism targets. Dataloggers were used for the automatic collection and transmission of data of the geotechnical sensors. Robotic total stations were used to automatically collect and transmit data from prism targets.

Project DetailsDeira Waterfront Development Plot-02 (Phase-01)
LocationDubai, UAE
ClientDeira Waterfront Development/ ITHRA Dubai
ContractorHSSG Foundation Contracting L.L.C.
ConsultantsDesign & Architecture Buerau, Dubai
Duration2019